Feeds

Martian MOM LAYS another EGG in SPACE - but it's not big enough

Rocket chokes, but probe still 'in normal health', say India's space boffins

Build a business case: developing custom apps

India's mission to Mars ran into its first problem today, failing to reach the required apogee of 100,000km when it tried to lift up its orbit.

The orbital trajectory of India

The planned orbital trajectory of India's Mangalyaan Mars probe

The Mangalyaan probe, aka the Mars Orbiter Mission or MOM, is due to keep circling the Earth for nearly a month, building up the height and speed necessary to perform a Hohmann transfer to the Red Planet in a series of gradually extending egg-shaped orbits.

The Indian Space and Research Organisation (ISRO) said in a statement that the satellite was still "in normal health" and it would try another orbit-raising exercise tomorrow.

This morning's orbit-raising was MOM's fourth and succeeded in pushing it from 71,623km to only 78,276km due to a failure in the flow control valve of the probe's engine. ISRO said that in the previous orbit-raising ops, the prime and redundant systems have functioned together correctly, but today, when both the primary and redundant coils of the solenoid flow control valve of were turned on together, the flow to the liquid-fuel engine stopped. The satellite continued climbing using its thrusters as a backup, as expected, but it wasn't able to reach 100,000km.

ISRO said that MOM didn't absolutely need to be able to use the two coils at the same time, because they could be operated independently in sequence instead.

With the extra burn scheduled for early tomorrow morning, MOM has three orbit-raising burns to go before it will get to around 918,000km from Earth: at which point it can head off to Mars. That moment is expected to come on December 1st, giving the probe until September 2014 to reach the Red Planet. There it will get its five instruments online to learn more about the composition of the Martian atmosphere. ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
LOHAN packs bags for SPACEPORT AMERICA!
Spanish launch goes titsup, we're off to the US of A
Gigantic toothless 'DRAGONS' dominated Earth's early skies
Gummy pterosaurs outlived toothy competitors
'Leccy racer whacks petrols in Oz race
ELMOFO rakes in two wins in sanctioned race
Boffins ID freakish spine-smothered prehistoric critter: The CLAW gave it away
Bizarre-looking creature actually related to velvet worms
CRR-CRRRK, beep, beep: Mars space truck backs out of slippery sand trap
Curiosity finds new drilling target after course correction
Astronomers scramble for obs on new comet
Amateur gets fifth confirmed discovery
Boffins build CYBORG-MOTHRA but not for evil: For search & rescue
This tiny bio-bot will chew through your clothes then save your life
Vulture 2 takes a battering in 100km/h test run
Still in one piece, but we're going to need MORE POWER
What does a flashmob of 1,024 robots look like? Just like this
Sorry, Harvard, did you say kilobots or KILLER BOTS?
prev story

Whitepapers

Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Top 10 endpoint backup mistakes
Avoid the ten endpoint backup mistakes to ensure that your critical corporate data is protected and end user productivity is improved.
Top 8 considerations to enable and simplify mobility
In this whitepaper learn how to successfully add mobile capabilities simply and cost effectively.
Rethinking backup and recovery in the modern data center
Combining intelligence, operational analytics, and automation to enable efficient, data-driven IT organizations using the HP ABR approach.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.