Feeds

How our shaken Reg Playmonaut survived a 113,000ft stratodangle

White knuckle ride in CHAV paper plane

  • alert
  • submit to reddit

High performance access to file storage

We're pleased to report that the intrepid Playmonaut who last weekend soared to 34,571m (113,421ft) during the test flight of our Special Project Electronic Altitude Release System (SPEARS) control board is, although somewhat shaken, otherwise none the worse for suffering a dramatic stratodangle.

Our intrepid miniature pilot was strapped into the cockpit of the Covert High Altitude Vehicle (CHAV) - an all-paper aircraft designed to have a pop at our own Guinness World Record for the highest launch of a paper plane:

The CHAV aircraft

The attempt was a bit of fun, and secondary to the mission's main objectives of testing the SPEARS board, the Clockwork High Altitude Release Mechanism (CHARM) and the custom igniter for our Vulture 2 spaceplane's rocket motor.

However, the flight turned into a white-knuckle ride for our diminutive adventurer, who ended up hanging beneath the main payload box during a high-speed return to Earth that ended in the treetops on the edge of Salisbury Plain.

The ascent was uneventful, although this still taken from the main payload video camera shows a problem with the drogue parachute which would ultimately leave the CHAV suspended in space:

The CHAV aircraft seen from the main payload on its ascent

We'll explain the parachute palaver in a minute, but first we thought you'd like a few snaps of the construction of the CHAV, based on the tried-and-trusted paper straw and A4 paper methodology as used in our Paper Aircraft Released Into Space (PARIS) Vulture 1.

The fuselage was put together from laminated paper bulkheads and straws...

The basic fuselage structure of the CHAV aircraft

...suitably reinforced where necessary:

Detailed view of the CHAV fuselage paper straw structure

The nylon cords in the above pic are the parachute lines, glued into three bulkheads to ensure the 'chute's deployment didn't rip the CHAV's tail off.

Our Playmonaut was positioned in a nose podule, detachable to allow insertion of the aircraft's electronics in the main fuselage:

The Playmonaut in the unskinned CHAV nose podule

The wings were a bit of a departure from the Vulture 1, being formed from laminated paper sheets glued together with Photo Mount, and then laid over a balsa-wood form in a vacuum bag and left to dry for three days. Once the form was removed, we had a one-piece main wing structure which we then reinforced with paper straw spars.

The CHAV with its paper wings attached

The original plan was to vacuum-form the entire aircraft using newspaper, or Advanced Fibre-Reinforced Organic Composite (AFROK) as LOHAN team member Neil Barnes dubbed it, but this proved impractical in the time available.

Sadly, then, our intention to use the Guardian for the left wing and the Daily Mail for the right wing - thereby achieving perfect aerodynamic and political balance - came to nothing.

The whole aircraft was designed and put together in just two weeks of evenings and weekends - a timescale which reflects the benefits of already having one paper aircraft build under our belts.

So, last Saturday we were ready to install the Raspberry Pi tracker/camera kit...

The Raspberry Pi kit before installation in the CHAV aircraft

...and the parachute, which was packed in a tail-mounted tube with an exposed drogue, as Dave Akerman and Anthony Stirk demonstrate:

Dave Akerman and Anthony Stirk pose with the CHAV

The parachute is a Civil Aviation Authority (CAA) requirement, and in the absence of a mechanism to deploy it at height X - due to complexity and time restraints - we decided to pull the 'chute out right after aircraft release using a static line attached to the main payload box.

Regarding the release mechanism, here's diagram of just how that works, with the LOHAN igniter burning through a cord attached to a steel wire loop glued into the top of the CHAV's fuslelage, and kept under tension by a spring-loaded balsa pressure plate covered in Teflon tape, so the plate couldn't freeze to either the payload box or the aircraft:

Diagram of the CHAV launch system

The plastic tube is simply to avoid the release cord tangling on something inside the payload box as the plane drops away. Here's the pressure plate during the main payload construction...

The balsa pressure plate under the main payload

...and here's the aircraft during a test coupling, before we installed the Picam in the CHAV's nose podule:

The CHAV mounted underneath the payload box

High performance access to file storage

More from The Register

next story
Elon Musk's LEAKY THRUSTER gas stalls Space Station supply run
Helium seeps from Falcon 9 first stage, delays new legs for NASA robonaut
Russian deputy PM: 'We are coming to the Moon FOREVER'
Plans to annex Earth's satellite with permanent base by 2030
KILLER SPONGES menacing California coastline
Surfers are safe, crustaceans less so
LOHAN's Punch and Judy show relaunches Thursday
Weather looking good for second pop at test flights
New FEMTO-MOON sighted BIRTHING from Saturn's RING
Icy 'Peggy' looks to be leaving the outer rings
Discovery time for 200m WONDER MATERIALS shaved from 4 MILLENNIA... to 4 years
Alloy, Alloy: Boffins in speed-classification breakthrough
Curiosity finds not-very-Australian-shaped rock on Mars
File under 'messianic pastries' and move on, people
Top Secret US payload launched into space successfully
Clandestine NRO spacecraft sets off on its unknown mission
Get your MOON GEAR: Auction to feature Space Race memorabilia
Keepsakes from early NASA, Soviet programs up for bids
prev story

Whitepapers

Securing web applications made simple and scalable
In this whitepaper learn how automated security testing can provide a simple and scalable way to protect your web applications.
Five 3D headsets to be won!
We were so impressed by the Durovis Dive headset we’ve asked the company to give some away to Reg readers.
HP ArcSight ESM solution helps Finansbank
Based on their experience using HP ArcSight Enterprise Security Manager for IT security operations, Finansbank moved to HP ArcSight ESM for fraud management.
The benefits of software based PBX
Why you should break free from your proprietary PBX and how to leverage your existing server hardware.
Mobile application security study
Download this report to see the alarming realities regarding the sheer number of applications vulnerable to attack, as well as the most common and easily addressable vulnerability errors.