Feeds

Heavenly SPEARS gives LOHAN a hot satisfying BANG

Fails to get CHAV off successfully, however

  • alert
  • submit to reddit

Build a business case: developing custom apps

The igniter boasts two independent E-Match connections, for a primary and failsafe trigger mechanism connections. The primary is, of course, SPEARS. The secondary is the magnificently garden shed boffinesque Clockwork High Altitude Release Mechanism (CHARM), featuring a clockwork oven timer, safety switch and a few wires:

The timer rigged to a battery holder and safety switch

Once the rig was mounted in a plastic box, we had the agreeable task of adding safety warning and "ARM" graphics:

The front of the box, with the timer dial and switch

CHARM has proved pretty accurate in ground tests, and since we can calculate the balloon rate of ascent, it offers a simple failsafe in the event SPEARS goes titsup.

With both trigger systems installed in the payload box, Paul Shackleton could connect the igniter (indicated), and wrap the PIC around the nylon cord holding the CHAV (pic by Neil's missus Anita Wegner):

Paul Shackleton connects the igniter, which is tied to the payload box. Pic: Anita Wegner

The flight launched from Blighty's Baikonur (Brightwalton in Berkshire) and came down in a tree at 51.23172, -1.63336, just south of Perham Down on the edge of Salisbury Plain. Once the team had retrieved the kit...

The LOHAN team poses after the flight

...we slurped the data from the SPEARS SD card. Here are the key points, with the CHARM timings included:

  • 11.50: CHARM armed, SPEARS safety time-out sequence initiated
  • 11.57: Launch
  • 12.00: 1,000m
  • 12.12: 5,000m
  • 12.26: 10,000m
  • 13.00: 20,000m - Safety altitude passed, SPEARS board armed
  • 13.30: 30,000m
  • 13.32: 30,523m - SPEARS fires igniter at programmed altitude
  • 13.43: 34,223m - Maximum detected altitude, balloon burst, momentary zero g
  • 13.44: 33,614m - 500m below maximum altitude, SPEARS descent trigger command issued
  • 13.50 (estimated): 20,879m - CHARM failsafe fires secondary igniter circuit
  • 14.19: Payload hits ground
  • 14.20: SPEARS safety time-out blows ignition fuse

It's evident the E-Match part of the igniter went off with hell of a bang, as shown by the scorching on the top of the payload box:

The scorching on the top of the payload box, caused by the igniter

However, the PIC began to burn and then fizzled out, thereby failing to cut the CHAV suspension cord.** Rob Eastwood was on the spot for a quick dissection, and you can see here how the PIC started to burn, then gave up the ghost.

The igniter dissected after the flight, showing that the PIC failed to burn

We already know PIC will burn in a vacuum, having successfully fired the custom igniter the Rocketry Experimental High Altitude Barosimulator (REHAB) chamber. It appears it doesn't much like the cold, so Rob and Paul are mulling just how to get round that problem.

In summary, then, both SPEARS and CHARM work as required, and are fit for duty. We need to address the igniter issue, and get a new model up and tested under mission conditions. As ever, your thoughts/observations are warmly welcomed. ®

Bootnote

*Here's some vid of the flight, from the main payload camera and then the Raspberry Pi camera mounted in the CHAV's nose:

Watch Video

**Academic, as it turns out, for reasons we'll explain tomorrow.

Secure remote control for conventional and virtual desktops

More from The Register

next story
Gigantic toothless 'DRAGONS' dominated Earth's early skies
Gummy pterosaurs outlived toothy competitors
Vulture 2 takes a battering in 100km/h test run
Still in one piece, but we're going to need MORE POWER
TRIANGULAR orbits will help Rosetta to get up close with Comet 67P
Probe will be just 10km from Space Duck in October
Boffins ID freakish spine-smothered prehistoric critter: The CLAW gave it away
Bizarre-looking creature actually related to velvet worms
CRR-CRRRK, beep, beep: Mars space truck backs out of slippery sand trap
Curiosity finds new drilling target after course correction
'Leccy racer whacks petrols in Oz race
ELMOFO rakes in two wins in sanctioned race
Astronomers scramble for obs on new comet
Amateur gets fifth confirmed discovery
Boffins build CYBORG-MOTHRA but not for evil: For search & rescue
This tiny bio-bot will chew through your clothes then save your life
What does a flashmob of 1,024 robots look like? Just like this
Sorry, Harvard, did you say kilobots or KILLER BOTS?
prev story

Whitepapers

Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Top 10 endpoint backup mistakes
Avoid the ten endpoint backup mistakes to ensure that your critical corporate data is protected and end user productivity is improved.
Top 8 considerations to enable and simplify mobility
In this whitepaper learn how to successfully add mobile capabilities simply and cost effectively.
Rethinking backup and recovery in the modern data center
Combining intelligence, operational analytics, and automation to enable efficient, data-driven IT organizations using the HP ABR approach.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.