Feeds

Heavenly SPEARS gives LOHAN a hot satisfying BANG

Fails to get CHAV off successfully, however

  • alert
  • submit to reddit

Build a business case: developing custom apps

The igniter boasts two independent E-Match connections, for a primary and failsafe trigger mechanism connections. The primary is, of course, SPEARS. The secondary is the magnificently garden shed boffinesque Clockwork High Altitude Release Mechanism (CHARM), featuring a clockwork oven timer, safety switch and a few wires:

The timer rigged to a battery holder and safety switch

Once the rig was mounted in a plastic box, we had the agreeable task of adding safety warning and "ARM" graphics:

The front of the box, with the timer dial and switch

CHARM has proved pretty accurate in ground tests, and since we can calculate the balloon rate of ascent, it offers a simple failsafe in the event SPEARS goes titsup.

With both trigger systems installed in the payload box, Paul Shackleton could connect the igniter (indicated), and wrap the PIC around the nylon cord holding the CHAV (pic by Neil's missus Anita Wegner):

Paul Shackleton connects the igniter, which is tied to the payload box. Pic: Anita Wegner

The flight launched from Blighty's Baikonur (Brightwalton in Berkshire) and came down in a tree at 51.23172, -1.63336, just south of Perham Down on the edge of Salisbury Plain. Once the team had retrieved the kit...

The LOHAN team poses after the flight

...we slurped the data from the SPEARS SD card. Here are the key points, with the CHARM timings included:

  • 11.50: CHARM armed, SPEARS safety time-out sequence initiated
  • 11.57: Launch
  • 12.00: 1,000m
  • 12.12: 5,000m
  • 12.26: 10,000m
  • 13.00: 20,000m - Safety altitude passed, SPEARS board armed
  • 13.30: 30,000m
  • 13.32: 30,523m - SPEARS fires igniter at programmed altitude
  • 13.43: 34,223m - Maximum detected altitude, balloon burst, momentary zero g
  • 13.44: 33,614m - 500m below maximum altitude, SPEARS descent trigger command issued
  • 13.50 (estimated): 20,879m - CHARM failsafe fires secondary igniter circuit
  • 14.19: Payload hits ground
  • 14.20: SPEARS safety time-out blows ignition fuse

It's evident the E-Match part of the igniter went off with hell of a bang, as shown by the scorching on the top of the payload box:

The scorching on the top of the payload box, caused by the igniter

However, the PIC began to burn and then fizzled out, thereby failing to cut the CHAV suspension cord.** Rob Eastwood was on the spot for a quick dissection, and you can see here how the PIC started to burn, then gave up the ghost.

The igniter dissected after the flight, showing that the PIC failed to burn

We already know PIC will burn in a vacuum, having successfully fired the custom igniter the Rocketry Experimental High Altitude Barosimulator (REHAB) chamber. It appears it doesn't much like the cold, so Rob and Paul are mulling just how to get round that problem.

In summary, then, both SPEARS and CHARM work as required, and are fit for duty. We need to address the igniter issue, and get a new model up and tested under mission conditions. As ever, your thoughts/observations are warmly welcomed. ®

Bootnote

*Here's some vid of the flight, from the main payload camera and then the Raspberry Pi camera mounted in the CHAV's nose:

Watch Video

**Academic, as it turns out, for reasons we'll explain tomorrow.

Boost IT visibility and business value

More from The Register

next story
Just TWO climate committee MPs contradict IPCC: The two with SCIENCE degrees
'Greenhouse effect is real, but as for the rest of it ...'
Asteroid's DINO KILLING SPREE just bad luck – boffins
Sauricide WASN'T inevitable, reckon scientists
Flamewars in SPAAACE: cooler fires hint at energy efficiency
Experiment aboard ISS shows we should all chill out for cleaner engines
Brit amateur payload set to complete full circle around PLANET EARTH
Ultralight solar radio tracker in glorious 25,000km almost-space odyssey
NASA Mars rover FINALLY equals 1973 Soviet benchmark
Yet to surpass ancient Greek one, however
Famous 'Dish' radio telescope to be emptied in budget crisis: CSIRO
Radio astronomy suffering to protect Square Kilometre Array
BEST BATTERY EVER: All lithium, all the time, plus a dash of carbon nano-stuff
We have found the Holy Grail (of batteries) - boffins
prev story

Whitepapers

Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Boost IT visibility and business value
How building a great service catalog relieves pressure points and demonstrates the value of IT service management.
Why and how to choose the right cloud vendor
The benefits of cloud-based storage in your processes. Eliminate onsite, disk-based backup and archiving in favor of cloud-based data protection.
The Essential Guide to IT Transformation
ServiceNow discusses three IT transformations that can help CIO's automate IT services to transform IT and the enterprise.
Maximize storage efficiency across the enterprise
The HP StoreOnce backup solution offers highly flexible, centrally managed, and highly efficient data protection for any enterprise.