Feeds

Heavenly SPEARS gives LOHAN a hot satisfying BANG

Fails to get CHAV off successfully, however

  • alert
  • submit to reddit

Intelligent flash storage arrays

The igniter boasts two independent E-Match connections, for a primary and failsafe trigger mechanism connections. The primary is, of course, SPEARS. The secondary is the magnificently garden shed boffinesque Clockwork High Altitude Release Mechanism (CHARM), featuring a clockwork oven timer, safety switch and a few wires:

The timer rigged to a battery holder and safety switch

Once the rig was mounted in a plastic box, we had the agreeable task of adding safety warning and "ARM" graphics:

The front of the box, with the timer dial and switch

CHARM has proved pretty accurate in ground tests, and since we can calculate the balloon rate of ascent, it offers a simple failsafe in the event SPEARS goes titsup.

With both trigger systems installed in the payload box, Paul Shackleton could connect the igniter (indicated), and wrap the PIC around the nylon cord holding the CHAV (pic by Neil's missus Anita Wegner):

Paul Shackleton connects the igniter, which is tied to the payload box. Pic: Anita Wegner

The flight launched from Blighty's Baikonur (Brightwalton in Berkshire) and came down in a tree at 51.23172, -1.63336, just south of Perham Down on the edge of Salisbury Plain. Once the team had retrieved the kit...

The LOHAN team poses after the flight

...we slurped the data from the SPEARS SD card. Here are the key points, with the CHARM timings included:

  • 11.50: CHARM armed, SPEARS safety time-out sequence initiated
  • 11.57: Launch
  • 12.00: 1,000m
  • 12.12: 5,000m
  • 12.26: 10,000m
  • 13.00: 20,000m - Safety altitude passed, SPEARS board armed
  • 13.30: 30,000m
  • 13.32: 30,523m - SPEARS fires igniter at programmed altitude
  • 13.43: 34,223m - Maximum detected altitude, balloon burst, momentary zero g
  • 13.44: 33,614m - 500m below maximum altitude, SPEARS descent trigger command issued
  • 13.50 (estimated): 20,879m - CHARM failsafe fires secondary igniter circuit
  • 14.19: Payload hits ground
  • 14.20: SPEARS safety time-out blows ignition fuse

It's evident the E-Match part of the igniter went off with hell of a bang, as shown by the scorching on the top of the payload box:

The scorching on the top of the payload box, caused by the igniter

However, the PIC began to burn and then fizzled out, thereby failing to cut the CHAV suspension cord.** Rob Eastwood was on the spot for a quick dissection, and you can see here how the PIC started to burn, then gave up the ghost.

The igniter dissected after the flight, showing that the PIC failed to burn

We already know PIC will burn in a vacuum, having successfully fired the custom igniter the Rocketry Experimental High Altitude Barosimulator (REHAB) chamber. It appears it doesn't much like the cold, so Rob and Paul are mulling just how to get round that problem.

In summary, then, both SPEARS and CHARM work as required, and are fit for duty. We need to address the igniter issue, and get a new model up and tested under mission conditions. As ever, your thoughts/observations are warmly welcomed. ®

Bootnote

*Here's some vid of the flight, from the main payload camera and then the Raspberry Pi camera mounted in the CHAV's nose:

Watch Video

**Academic, as it turns out, for reasons we'll explain tomorrow.

Providing a secure and efficient Helpdesk

More from The Register

next story
GRAV WAVE DRAMA: 'Big Bang echo' may have been grit on the scanner – boffins
Exit Planet Dust on faster-than-light expansion of universe
SpaceX Dragon cargo truck flies 3D printer to ISS: Clawdown in 3, 2...
Craft berths at space station with supplies, experiments, toys
That glass of water you just drank? It was OLDER than the SUN
One MEELLION years older. Some of it anyway
NASA rover Curiosity drills HOLE in MARS 'GOLF COURSE'
Joins 'traffic light' and perfect stony sphere on the Red Planet
Big dinosaur wowed females with its ENORMOUS HOOTER
That's right, Doris, I've got biggest snout in the prehistoric world
Japanese volcano eruption reportedly leaves 31 people presumed dead
Hopes fade of finding survivors on Mount Ontake
Canberra drone team dances a samba in Outback Challenge
CSIRO's 'missing bushwalker' found and watered
prev story

Whitepapers

A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
Storage capacity and performance optimization at Mizuno USA
Mizuno USA turn to Tegile storage technology to solve both their SAN and backup issues.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Beginner's guide to SSL certificates
De-mystify the technology involved and give you the information you need to make the best decision when considering your online security options.
Security for virtualized datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.