Feeds

LOHAN rolls out racy rocketry round-up

Progress to date on our audacious spaceplane mission

  • alert
  • submit to reddit

Top 5 reasons to deploy VMware with Tegile

3: Rocket motor heater

One big concern is the effect of cold on the rocket motor at altitude, where the temperatures can get down to -60°C.

After a few sleepless nights imagining a frozen cylinder of ammonium perchlorate composite propellant (APCP), we decided to launch a pre-emptive strike on the problem and ordered a space-grade Polyimide Thermofoil flexible heater:

Our new Polyimide Thermofoil flexible heater

This will be wrapped round the motor casing, with a layer of space blanket as insulation, and held in place with some heat-shrink tubing.

The effective area of the heater is 46.54 in2 (300.257 cm2), and its resistance is 64Ω. A quick calculation revealed that at 12V, it'd be running at 0.1875A and pumping out 2.24W - a watt density of 0.05W/in2, or 0.0078W/cm2.

Once we've got the rocket casing and heater in a tight embrace, we'll test to see just how much juice we need, and for how long, to the keep the temperature up.

We have three options: pre-heat on the ground, heat during the ascent phase, or a combination of both. Whichever ultimately proves necessary, it won't impact on the Vulture 2's weight, since any batteries will be external.

If we do heat during the ascent phase, we'll have to work out an umbilical system to supply power to the heater, and which will detach easily when the aircraft launches.

We're sure readers have some bright ideas as to how that can be done with the minimum of fuss.

4: Fantastical flying truss

Watch Video

As the above vid shows, we've done some testing to see just how our flying truss will, er, fly, and now have a definitive design, seen here in our lovingly-crafted one-quarter scale model:

The one-quarter scale model of our flying truss, with tail

You'll note it's sprouted a tail, which helps keep the truss orientated into the wind. We've just ordered the carbon fibre rods and fittings to construct the full-fat, two-metre long truss, so we'll do more testing when we've put that together.

What we can't do at this stage is add the titanium launch rod, since we'll need the Vulture 2 to work out its exact positioning.

Internet Security Threat Report 2014

More from The Register

next story
I'll be back (and forward): Hollywood's time travel tribulations
Quick, call the Time Cops to sort out this paradox!
Antarctic ice THICKER than first feared – penguin-bot boffins
Robo-sub scans freezing waters, rocks warming models
Your PHONE is slowly KILLING YOU
Doctors find new Digitillnesses - 'text neck' and 'telepressure'
Reuse the Force, Luke: SpaceX's Elon Musk reveals X-WING designs
And a floating carrier for recyclable rockets
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
Bond villains lament as Wicked Lasers withdraw death ray
Want to arm that shark? Better get in there quick
prev story

Whitepapers

Driving business with continuous operational intelligence
Introducing an innovative approach offered by ExtraHop for producing continuous operational intelligence.
Why CIOs should rethink endpoint data protection in the age of mobility
Assessing trends in data protection, specifically with respect to mobile devices, BYOD, and remote employees.
Getting started with customer-focused identity management
Learn why identity is a fundamental requirement to digital growth, and how without it there is no way to identify and engage customers in a meaningful way.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Simplify SSL certificate management across the enterprise
Simple steps to take control of SSL across the enterprise, and recommendations for a management platform for full visibility and single-point of control for these Certificates.