Feeds

First private-sector space station docking delayed

Elon Musk's Dragon not yet ready for mating

Choosing a cloud hosting partner with confidence

The first private-sector mission to carry supplies to the International Space Station (ISS) has been delayed, according to reports. Meanwhile NASA funding for such contracted-out missions is to be cut back.

The Dragon capsule and upper stage separate from the Falcon 9. Credit: NASA

Not happening again until next year, it seems.

The Wall Street Journal reports on the problems facing the nascent US space-launch private sector, saying that the mould-breaking startup rocket firm, SpaceX, now doesn't expect to send its first supply ship to the ISS until well into next year - perhaps as late as April. The launch had been expected before the end of this year.

According to the WSJ's sources, the delays are the result of engineers needing to modify control software aboard the Dragon capsule which is intended to dock automatically with the ISS to deliver a load of supplies to the orbiting station. The Dragon would be launched atop a Falcon 9 rocket stack, also supplied by SpaceX.

The Dragon/Falcon 9 combo has already had a successful test flight last October, though on that occasion the capsule re-entered atmosphere to splash down in the Pacific: and it carried only a large cheese rather than a load of supplies. The trial was the first ever orbital launch and recovery by a private entity as opposed to a national government.

SpaceX's rockets are new designs, developed from scratch, and they run on kerosene fuel. The established US rocketry base, run by a monopoly consortium of America's two biggest aerospace companies (Lockheed and Boeing, teamed as United Launch Alliance) in partnership with NASA and the US military/intelligence community, mostly uses or intends to use older technology and tends to favour cryogenic hydrogen fuel - especially for manned missions of the future.

The huge workforces associated with NASA and ULA and their legacy 1960s technology, combined with the difficulty and cost of using hydrogen as opposed to comparatively easy-to-handle kerosene, have meant that SpaceX can offer hugely lower launch costs - and that it presents a terrible threat to a lot of American jobs. This in turn means that it faces powerful political opposition in Washington.

Unsurprisingly then given the general need for the US government to cut spending, the WSJ also reports that NASA funding intended to hire commercial firms - realistically SpaceX is the main contender - to carry astronauts as well as cargo to the station is likely to be cut. SpaceX and its famous techbiz-visionary chief Elon Musk have never made any secret of the fact that they aim to carry people as well as stuff to space, and the company contends that the Dragon is fully "man-rated" as it stands.

Provided that Musk can continue to make good on his promises, money spent on SpaceX rockets should deliver a lot more lift than money spent on ordinary NASA/ULA projects. Commercial space funding should not be cut if the aim is really to save money: rather it would make more sense to get rid of fantastically costly and questionable efforts such as the planned Space Launch System, a massive rocket based on recycled Shuttle and Apollo-era hydrogen technology which looks set to swallow up so much cash that NASA will be able to afford almost nothing else.

But politically it would be better if federal cash turned not into lift, but into jobs - and this is where ULA is a better buy than SpaceX. So it seems quite plausible that commercial-space budgets will take a disproportionate share of the NASA cuts now being deliberated upon.

The WSJ report is here (partial paywall in force). ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
GRAV WAVE DRAMA: 'Big Bang echo' may have been grit on the scanner – boffins
Exit Planet Dust on faster-than-light expansion of universe
Mine Bitcoins with PENCIL and PAPER
Forget Sudoku, crunch SHA-256 algos
SpaceX Dragon cargo truck flies 3D printer to ISS: Clawdown in 3, 2...
Craft berths at space station with supplies, experiments, toys
'This BITE MARK is a SMOKING GUN': Boffins probe ancient assault
Tooth embedded in thigh bone may tell who pulled the trigger
DOLPHINS SMELL MAGNETS – did we hear that right, boffins?
Xavier's School for Gifted Magnetotaceans
Big dinosaur wowed females with its ENORMOUS HOOTER
That's right, Doris, I've got biggest snout in the prehistoric world
Japanese volcano eruption reportedly leaves 31 people presumed dead
Hopes fade of finding survivors on Mount Ontake
That glass of water you just drank? It was OLDER than the SUN
One MEELLION years older. Some of it anyway
Canberra drone team dances a samba in Outback Challenge
CSIRO's 'missing bushwalker' found and watered
NASA rover Curiosity drills HOLE in MARS 'GOLF COURSE'
Joins 'traffic light' and perfect stony sphere on the Red Planet
prev story

Whitepapers

Forging a new future with identity relationship management
Learn about ForgeRock's next generation IRM platform and how it is designed to empower CEOS's and enterprises to engage with consumers.
Storage capacity and performance optimization at Mizuno USA
Mizuno USA turn to Tegile storage technology to solve both their SAN and backup issues.
The next step in data security
With recent increased privacy concerns and computers becoming more powerful, the chance of hackers being able to crack smaller-sized RSA keys increases.
Security for virtualized datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.
A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.