Feeds

Euro space truck consigned to flaming death

Johannes Kepler burns up over Pacific

Remote control for virtualized desktops

The European Space Agency yesterday sent its space truck Johannes Kepler to a fiery death over the South Pacific in a perfectly-executed "destructive re-entry" at the end of the spacecraft's four-month mission to the International Space Station.

ESA's second Automated Transfer Vehicle (ATV-2) plunged into Earth's atmosphere after two thruster burns designed to bring any remaining debris down in an uninhabited stretch of ocean. ESA explains: "Just before hitting the atmosphere, Johannes Kepler was commanded to begin tumbling to ensure it would disintegrate and burn up safely."

Artist's impression of the Johannes Kepler burning up in the atmosphere. Pic: ESA/D. Ducros

As predicted, a few pieces did survive the intense heat to hit the water at around 21:00 GMT last night. The substantial Russian docking adaptor and main engines came down in an area roughly 6000km west of Chile.

As well as 1,200kg of ISS waste and redundant hardware, the Johannes Kepler was carrying a prototype "black box" which recorded the spacecraft's last moments, grabbing data on "acceleration, roll, pitch and yaw rates, temperatures and GPS coordinates". Once free of the disintegrating ATV, it continued a solo descent, protected by its own heatshield, before making a last call to send the data via the Iridium satphone system.

ESA hopes this info "will help to predict what happens to space hardware as it re-enters and comes apart under aerodynamic heating and loads".

The Johannes Kepler docked with the ISS. Pic: NASA

The 20-tonne Johannes Kepler blasted off from Kourou spaceport in French Guiana on 17 February, carrying 4,534kg of propellant for ISS reboost and attitude control, 1,600kg of dry cargo, 850kg of propellant for the Zvezda module and 100kg of oxygen.

Alberto Novelli, head of ESA’s ATV Mission Operations, said of the successful mission: "We broke many records with ATV-2. Not only was this the heaviest payload ever launched by ESA and the Ariane 5 rocket, but the ATV’s engines also achieved the biggest boost for human spaceflight since the Apollo missions to the Moon: we raised the Space Station's orbit by more than 40 kilometres."

Nico Dettmann, head of the ATV Programme, chipped in with: "ATV has shown again its capabilities in servicing the Station and we are looking forward to the next, Edoardo Amaldi, which will be shipped to Kourou in August for launch in early 2012." ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
Renewable energy 'simply WON'T WORK': Top Google engineers
Windmills, solar, tidal - all a 'false hope', say Stanford PhDs
SEX BEAST SEALS may be egging each other on to ATTACK PENGUINS
Boffin: 'I think the behaviour is increasing in frequency'
HUMAN DNA 'will be FOUND ON MOON' – rockin' boffin Brian Cox
Crowdfund plan to stimulate Blighty's space programme
Post-pub nosh neckfiller: The MIGHTY Scotch egg
Off to the boozer? This delicacy might help mitigate the effects
I'M SO SORRY, sobs Rosetta Brit boffin in 'sexist' sexy shirt storm
'He is just being himself' says proud mum of larger-than-life physicist
NASA launches new climate model at SC14
75 days of supercomputing later ...
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
prev story

Whitepapers

Why cloud backup?
Combining the latest advancements in disk-based backup with secure, integrated, cloud technologies offer organizations fast and assured recovery of their critical enterprise data.
Getting started with customer-focused identity management
Learn why identity is a fundamental requirement to digital growth, and how without it there is no way to identify and engage customers in a meaningful way.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Simplify SSL certificate management across the enterprise
Simple steps to take control of SSL across the enterprise, and recommendations for a management platform for full visibility and single-point of control for these Certificates.
Top 5 reasons to deploy VMware with Tegile
Data demand and the rise of virtualization is challenging IT teams to deliver storage performance, scalability and capacity that can keep up, while maximizing efficiency.