Feeds

Space shuttle Endeavour launch delayed until at least May 8

No power to heaters

Secure remote control for conventional and virtual desktops

NASA has once again delayed the final launch of the space shuttle Endeavour, as it works to correct the electrical problem that postponed Friday's original launch attempt.

The shuttle will now launch no earlier than May 8 (next Sunday).

This past Friday, shuttle launch director Mike Leinbach scrubbed the scheduled 3:37pm eastern launch of Endeavour as engineers investigated a failure to one of the heating circuits serving an Auxiliary Power Unit (APU). The heaters prevent the APU's hydrazine from freezing while the shuttle is in orbit.

Engineers believed the problem was associated with a switchbox at the spacecraft's aft end or an electrical short in the wires that connect to the switchbox. On Saturday, engineers entered the shuttle's aft comparent to examine the malfunctioning system, and on Sunday, NASA announced that as testing continued, the shuttle would not launch on Monday as was previously indicated.

According to the NASA website, the issue seems to involve the aft load control assembly-2 (ALCA-2), a box of switches controlling power feeds. "That basically means the power is not getting out to the heaters that weren't working on launch day," Space Shuttle Program Launch Integration Manager Mike Moses said.

The six Endeavour astronauts have returned to Johnson Space Center in Houston for more training before they go back to Kennedy for the next launch attempt. ®

Remote control for virtualized desktops

More from The Register

next story
Antarctic ice THICKER than first feared – penguin-bot boffins
Robo-sub scans freezing waters, rocks warming models
I'll be back (and forward): Hollywood's time travel tribulations
Quick, call the Time Cops to sort out this paradox!
Your PHONE is slowly KILLING YOU
Doctors find new Digitillnesses - 'text neck' and 'telepressure'
Reuse the Force, Luke: SpaceX's Elon Musk reveals X-WING designs
And a floating carrier for recyclable rockets
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
Bond villains lament as Wicked Lasers withdraw death ray
Want to arm that shark? Better get in there quick
prev story

Whitepapers

Go beyond APM with real-time IT operations analytics
How IT operations teams can harness the wealth of wire data already flowing through their environment for real-time operational intelligence.
5 critical considerations for enterprise cloud backup
Key considerations when evaluating cloud backup solutions to ensure adequate protection security and availability of enterprise data.
Forging a new future with identity relationship management
Learn about ForgeRock's next generation IRM platform and how it is designed to empower CEOS's and enterprises to engage with consumers.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.
How to simplify SSL certificate management
Simple steps to take control of SSL certificates across the enterprise, and recommendations centralizing certificate management throughout their lifecycle.