Feeds

Space shuttle Endeavour launch delayed until at least May 8

No power to heaters

Choosing a cloud hosting partner with confidence

NASA has once again delayed the final launch of the space shuttle Endeavour, as it works to correct the electrical problem that postponed Friday's original launch attempt.

The shuttle will now launch no earlier than May 8 (next Sunday).

This past Friday, shuttle launch director Mike Leinbach scrubbed the scheduled 3:37pm eastern launch of Endeavour as engineers investigated a failure to one of the heating circuits serving an Auxiliary Power Unit (APU). The heaters prevent the APU's hydrazine from freezing while the shuttle is in orbit.

Engineers believed the problem was associated with a switchbox at the spacecraft's aft end or an electrical short in the wires that connect to the switchbox. On Saturday, engineers entered the shuttle's aft comparent to examine the malfunctioning system, and on Sunday, NASA announced that as testing continued, the shuttle would not launch on Monday as was previously indicated.

According to the NASA website, the issue seems to involve the aft load control assembly-2 (ALCA-2), a box of switches controlling power feeds. "That basically means the power is not getting out to the heaters that weren't working on launch day," Space Shuttle Program Launch Integration Manager Mike Moses said.

The six Endeavour astronauts have returned to Johnson Space Center in Houston for more training before they go back to Kennedy for the next launch attempt. ®

Choosing a cloud hosting partner with confidence

More from The Register

next story
Antarctic ice THICKER than first feared – penguin-bot boffins
Robo-sub scans freezing waters, rocks warming models
I'll be back (and forward): Hollywood's time travel tribulations
Quick, call the Time Cops to sort out this paradox!
Your PHONE is slowly KILLING YOU
Doctors find new Digitillnesses - 'text neck' and 'telepressure'
Reuse the Force, Luke: SpaceX's Elon Musk reveals X-WING designs
And a floating carrier for recyclable rockets
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
Bond villains lament as Wicked Lasers withdraw death ray
Want to arm that shark? Better get in there quick
prev story

Whitepapers

Driving business with continuous operational intelligence
Introducing an innovative approach offered by ExtraHop for producing continuous operational intelligence.
Why CIOs should rethink endpoint data protection in the age of mobility
Assessing trends in data protection, specifically with respect to mobile devices, BYOD, and remote employees.
A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Protecting against web application threats using SSL
SSL encryption can protect server‐to‐server communications, client devices, cloud resources, and other endpoints in order to help prevent the risk of data loss and losing customer trust.