Feeds

Space shuttle Endeavour launch delayed until at least May 8

No power to heaters

Beginner's guide to SSL certificates

NASA has once again delayed the final launch of the space shuttle Endeavour, as it works to correct the electrical problem that postponed Friday's original launch attempt.

The shuttle will now launch no earlier than May 8 (next Sunday).

This past Friday, shuttle launch director Mike Leinbach scrubbed the scheduled 3:37pm eastern launch of Endeavour as engineers investigated a failure to one of the heating circuits serving an Auxiliary Power Unit (APU). The heaters prevent the APU's hydrazine from freezing while the shuttle is in orbit.

Engineers believed the problem was associated with a switchbox at the spacecraft's aft end or an electrical short in the wires that connect to the switchbox. On Saturday, engineers entered the shuttle's aft comparent to examine the malfunctioning system, and on Sunday, NASA announced that as testing continued, the shuttle would not launch on Monday as was previously indicated.

According to the NASA website, the issue seems to involve the aft load control assembly-2 (ALCA-2), a box of switches controlling power feeds. "That basically means the power is not getting out to the heaters that weren't working on launch day," Space Shuttle Program Launch Integration Manager Mike Moses said.

The six Endeavour astronauts have returned to Johnson Space Center in Houston for more training before they go back to Kennedy for the next launch attempt. ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
MEN: For pity's sake SLEEP with LOTS of WOMEN - and avoid Prostate Cancer
And, um, don't sleep with other men. If that's what worries you
Voyager 1 now EIGHTEEN LIGHT HOURS from home
Almost 20 BEEELION kilometres from Sol
HUGE SHARK as big as a WWII SUBMARINE died out, allowing whales to exist
Who'd win a fight: Megalodon or a German battleship?
Jim Beam me up, Scotty! WHISKY from SPAAACE returns to Earth
They're insured for $1m, before you thirsty folks make plans
ROGUE SAIL BOAT blocks SPACE STATION PODULE blastoff
Er, we think our ISS launch beats your fishing expedition
Comet Siding Spring revealed as flying molehill
Hiding from this space pimple isn't going to do humanity's reputation any good
BAE points electromagnetic projectile at US Army
Railguns for 'Future fighting vehicle'
LONG ARM of the SAUR: Brachially gifted dino bone conundrum solved
Deinocheirus mirificus was a bit of a knuckle dragger
prev story

Whitepapers

Why and how to choose the right cloud vendor
The benefits of cloud-based storage in your processes. Eliminate onsite, disk-based backup and archiving in favor of cloud-based data protection.
Forging a new future with identity relationship management
Learn about ForgeRock's next generation IRM platform and how it is designed to empower CEOS's and enterprises to engage with consumers.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.
Saudi Petroleum chooses Tegile storage solution
A storage solution that addresses company growth and performance for business-critical applications of caseware archive and search along with other key operational systems.
Getting ahead of the compliance curve
Learn about new services that make it easy to discover and manage certificates across the enterprise and how to get ahead of the compliance curve.