I recently revisited my all time favourite consulting experience; the design and construction of a mid-sized render farm. I had never done anything quite like it before; it took a full summer’s worth of research and two months to fully install and test the final design.

The render farm consisted of 400 render nodes, a rack’s worth of storage, a cluster of three Red Hat servers handing out Linux to the render nodes and a single Windows XP system running the controller software. This farm has just finished its fourth year of continuous operation and the client has reluctantly decided that the time has come to replace it.

I had not heard much about this farm since final delivery and the subsequent completion of the first production render. Sitting down with the client and his in-house systems administrator to discuss their trials and tribulations over the past four years working with my “baby” was an eye opener.

Apart from a disk upgrade to the storage rack and a CPU upgrade to the render nodes, very little had been touched on the render farm during it’s operational lifetime. The farm experienced a few disk failures, but nothing above average. The render nodes had grown some bad DIMMs yet had lost but a single motherboard.

Astonishingly, the Linux distribution in use is the same today as on the day it was installed; the configuration files had never once been touched. Considering the evolutionary pace of 3D software I found this hard to believe, but apparently they have gotten along just fine working with a years-old version of Lightwave.

The client had upgraded shortly after the render farm was completed; and this slightly newer version was apparently still compatible with the render farm. Indeed, it was not the speed of the render farm that was driving the request for an upgrade but rather a desire to finally update their software beyond a version nearly four years old. The newer versions of Lightwave will apparently not talk to the vastly dated software on the render farm.

More punch, more power

We went back to my lab, lashed together a few test systems and discovered to our amazement that the entire 400-node render system could probably be replaced with two dozen modern servers running sexy video cards. Numbers were juggled and it was decided that the replacement build would start with a 50-node render farm with two video cards per node.

I asked the client what he would do with the space freed up by such an upgrade. I was worried he would do something silly like packing the datacenter full of storage boxes resulting in compromised airflow. This proved to be a fateful question; apparently this upgrade would free up enough physical space in their datacenter to be able to make a bid on a major contract. Success would mean fleshing their 50 node farm out into a 500-node farm.

It was here that things got gluey. The servers we had just designed easily pulled over three times the power than did the old ones. Their existing datacenter has neither the electrical service nor the cooling to handle anything close to 500 of these new nodes.

The incident serves as an illustration of why a little bit of paranoia is beneficial in the long run. There’s more to upgrades than simply updating software or swapping boxes. Just as we must take into consideration software items such as patches, drivers, and the many and varied ways our systems interact with others, the interaction of our servers with their physical environment is something about which we should always be concerned.

Secure remote control for conventional and virtual desktops

More from The Register

next story
The Return of BSOD: Does ANYONE trust Microsoft patches?
Sysadmins, you're either fighting fires or seen as incompetents now
Microsoft: Azure isn't ready for biz-critical apps … yet
Microsoft will move its own IT to the cloud to avoid $200m server bill
Oracle reveals 32-core, 10 BEEELLION-transistor SPARC M7
New chip scales to 1024 cores, 8192 threads 64 TB RAM, at speeds over 3.6GHz
US regulators OK sale of IBM's x86 server biz to Lenovo
Now all that remains is for gov't offices to ban the boxes
Flash could be CHEAPER than SAS DISK? Come off it, NetApp
Stats analysis reckons we'll hit that point in just three years
Object storage bods Exablox: RAID is dead, baby. RAID is dead
Bring your own disks to its object appliances
Nimble's latest mutants GORGE themselves on unlucky forerunners
Crossing Sandy Bridges without stopping for breath
prev story

Whitepapers

Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Top 10 endpoint backup mistakes
Avoid the ten endpoint backup mistakes to ensure that your critical corporate data is protected and end user productivity is improved.
Top 8 considerations to enable and simplify mobility
In this whitepaper learn how to successfully add mobile capabilities simply and cost effectively.
Rethinking backup and recovery in the modern data center
Combining intelligence, operational analytics, and automation to enable efficient, data-driven IT organizations using the HP ABR approach.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.