We spent how much?

Budget overruns needn't be normal

  • alert
  • submit to reddit

Secure remote control for conventional and virtual desktops

Project management According to the grassroots campaigning group the Taxpayers’ Alliance, overruns in UK government IT projects have run into several billion pounds. If a similar tally were made of private sector overruns, they would most likely be of a similar order of magnitude. It is just that public sector overspends are much better publicised because taxpayers foot the bill when something goes wrong and expect to be told.

Some IT managers might be tempted to breathe a sigh of relief, knowing that overspends are par for the course. However, with current economic conditions squeezing budgets and spending under closer scrutiny, there is much to lose when IT projects go over budget, not least one's job.

Many IT projects overrun because they are not properly specified, which can happen in a number of ways. To begin with, numerous technical dependencies need to be taken into account. A unified communications implementation, for example, will be reliant on an IP telephony infrastructure, which will in turn be dependent on the underlying network infrastructure. Or a hosted services rollout may be dependent on the right front ends with appropriate connectivity and integration with other applications within the business. It may only run with certain versions of given applications. Failure to miss these key points early on means additional work further down the line – which of course translates to higher costs and a longer rollout.

In focusing mainly on a new IT system’s functionality, people sometimes neglect service-level issues such as resilience or disaster recovery. In one example we know, a company implemented an IP telephony system without first carrying out a thorough assessment of its own communications infrastructure. As soon as the system went live it promptly fell over, having overloaded the local area network. This might not have been so serious had the old analogue system not been switched off the same day to conserve cash. The network had to go through an unplanned, expensive and hasty upgrade, during which staff had to use mobile phones to make business calls.

The fallout from this failure went beyond the financial hit – although that was significant enough. Business was lost as a result of customers not being able to call in. And the rushed upgrade meant that system glitches were never properly dealt with, as there was no time for proper testing.

Such extreme cases of poor planning appear almost farcical, but less dramatic oversights occur on a regular basis. Whether it’s failing to appreciate that a server virtualisation project will need a storage infrastructure upgrade, or that kitting out the sales guys with iPads will require some application changes because their front ends won’t render properly in mobile Safari, unplanned costs soon add up.

Business dependencies can also be missed. For example, a system being implemented as an internal departmental solution may actually need to be accessed more broadly – for example by key suppliers or customers or by staff from other departments. Retrofitting the system to deal with the security and access implications may just turn out to be impossible without a fundamental revisiting of its architecture.

A more subtle reason for overruns, and one that is harder to control, is scope creep, where interim decisions are taken along the way to build in more features or functionality. Departing from the original specification may cause more than incremental costs if new dependencies emerge as a result of the extended scope.

Because IT project costs are not the easiest thing to keep control of, the capability of the project manager (PM) is crucial. Good PMs will be able scope a project based on the various dependencies, weeding out any duplication of effort, identifying gaps and building in sufficient contingency. Importantly, this will be done in collaboration with the various stakeholders across the business as well as with technical specialists. Good PMs will also manage resources to keep things on track, taking a firm line whenever scope creep threatens.

The unforeseen can always still happen but good project management practices, underpinned by regular checkpoints, should spot the early warning signs that spend is going higher than it should. The overrun can then be addressed by trimming down the scope of the project, or dropping the quality of some of the deliverables, or even calling on the contingency. An increase in the budget is also an option, although often a politically less attractive one.

Adept project management has little value if it is not underpinned by authority and accountability. This requires clear definition of all key roles and responsibilities, with the understanding that if things go off the rails for no good reason, then heads will roll – not just the project manager’s but those of key stakeholders and even beyond. Everyone needs to be working off the same page.

There are no guarantees that IT projects will be delivered within budget, but if you treat an overrun as inevitable, then it probably will be. ®

Top 5 reasons to deploy VMware with Tegile

More from The Register

next story
Google+ goes TITSUP. But WHO knew? How long? Anyone ... Hello ...
Wobbly Gmail, Contacts, Calendar on the other hand ...
Preview redux: Microsoft ships new Windows 10 build with 7,000 changes
Latest bleeding-edge bits borrow Action Center from Windows Phone
Microsoft promises Windows 10 will mean two-factor auth for all
Sneak peek at security features Redmond's baking into new OS
UNIX greybeards threaten Debian fork over systemd plan
'Veteran Unix Admins' fear desktop emphasis is betraying open source
Google opens Inbox – email for people too stupid to use email
Print this article out and give it to someone techy if you get stuck
DEATH by PowerPoint: Microsoft warns of 0-day attack hidden in slides
Might put out patch in update, might chuck it out sooner
Redmond top man Satya Nadella: 'Microsoft LOVES Linux'
Open-source 'love' fairly runneth over at cloud event
prev story

Whitepapers

Cloud and hybrid-cloud data protection for VMware
Learn how quick and easy it is to configure backups and perform restores for VMware environments.
A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Three 1TB solid state scorchers up for grabs
Big SSDs can be expensive but think big and think free because you could be the lucky winner of one of three 1TB Samsung SSD 840 EVO drives that we’re giving away worth over £300 apiece.
Security for virtualized datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.