Feeds

Shuttle Discovery further delayed by leaky boil-off umbilical

Veteran ship wreathed in explosive gas

The smart choice: opportunity from uncertainty

NASA's several-times-delayed bid to launch space shuttle Discovery on its final planned mission - a trip delivering supplies and parts to the International Space Station - has been scrubbed again following a "significant" leak in a hydrogen boil-off safety flare stack pipe.

The leaky Ground Umbilical Carrier Plate (GUCP) attached to shuttle Discovery's last fuel tank. Credit: NASA

The factory which made this was shutting down with massive job losses.

According to a NASA statement issued earlier this afternoon, the earliest that Discovery can now launch following repairs to the leaky Ground Umbilical Carrier Plate (GUCP) is Monday. That would be the last chance remaining in the present orbital launch window: should no launch occur on Monday, the next window runs from the 30 November to 5 December.

The faulty GUCP is an assembly which connects the shuttle's large orange external fuel drop-tank to a massive 17-inch pipe that carries away gaseous hydrogen which has boiled off from the cryogenic liquid in the tank. If the hydrogen were allowed to escape and mix with air, it would become a major explosion risk: hence it is piped away safely and burned off in a flare stack clear of the pad. The GUCP is a bit more complicated than an ordinary plug for a deadly explosive rocketfuel gas pipe, however, as it needs to release the umbilical easily, reliably and without human assistance at launch time.

Shuttle launch director Mike Leinbach said that the "significant" hydrogen GUCP leak was similar to previous snags occurring on other shuttle launches, though he admitted that today's was "higher in magnitude and occurred earlier in the fuelling process".

NASA reports that the colossal tank is now being drained of fuels and will then need to be "inerted" - flushed through with helium - for 20 hours before technicians can get started on fixing the GUCP at the weekend. Depending on what they can achieve, a go or no-go decision will be made regarding a Monday launch attempt on Saturday.

As and when Discovery finally flies, it will be the veteran ship's 39th and final planned mission. The shuttle is loaded with various supplies, parts and experiments for the ISS, including a new pressurised hab module, a humanoid robotic torso intended for maintenance work and a complement of experimental mice participating in studies of bizarre space plague effects. ®

The Power of One Infographic

More from The Register

next story
World Solar Challenge contender claims new speed record
One charge sees Sunswift travel 500kms at over 100 km/h
Vote now for LOHAN's stirring mission patch motto
Does the shed actually know no bounds, or what?
SMELL YOU LATER, LOSERS – Dumbo tells rats, dogs... humans
Junk in the trunk? That's what people have
The Sun took a day off last week and made NO sunspots
Someone needs to get that lazy star cooking again before things get cold around here
Boffins discuss AI space program at hush-hush IARPA confab
IBM, MIT, plenty of others invited to fill Uncle Sam's spy toolchest, but where's Google?
Beancounters tell NASA it's too poor to fly planned mega-rocket
Space Launch System would need another $400m and a lot of time
Jurassic squawk: Dinos were Earth's early FEATHERED friends
Boffins research: Ancient dinos may all have had 'potential' fluff
prev story

Whitepapers

Top three mobile application threats
Prevent sensitive data leakage over insecure channels or stolen mobile devices.
Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Boost IT visibility and business value
How building a great service catalog relieves pressure points and demonstrates the value of IT service management.
Designing a Defense for Mobile Applications
Learn about the various considerations for defending mobile applications - from the application architecture itself to the myriad testing technologies.
Build a business case: developing custom apps
Learn how to maximize the value of custom applications by accelerating and simplifying their development.