Feeds

Ares I-X trundles to launchpad

Headed for the future or the scrapheap?

Choosing a cloud hosting partner with confidence

NASA's Ares I-X test rocket is currently trundling towards Launch Pad 39B at Kennedy Space Centre ahead of a slated 27 October first test flight.

The Ares I-X trundles towards the launchpad. Pic: NASA

The vehicle, described by NASA as the "essential core of a safe, reliable, cost-effective space transportation system" and built on "cutting-edge launch technologies, evolved powerful Apollo and space shuttle propulsion elements, and decades of NASA spaceflight experience", represents the trailblazer for the agency's Constellation programme.

Indeed, the Ares I's first stage, five-segment solid rocket booster is a space shuttle spin-off, while its upper-stage J-2X engine is derived from the "powerful J-2 engine that propelled the Apollo-era Saturn IB and Saturn V rockets"

The rocket is designed to carry the all-new "Orion crew exploration vehicle", which NASA hopes will be making it first trips to the International Space Station "early in the next decade", and thereafter carrying humans "back to the Moon, and then onward to Mars and other destinations in the solar system".

For the test flight, the Ares I-X will carry a dummy upper stage to an altitude of 40km (25 miles), while sensors measure the vehicle's performance. The dummy stage will be lost when it impacts with the Atlantic, while the solid booster will parachute down to an ocean recovery.

Trent Smith, the vehicle processing engineer for the Ares 1-X, told the BBC: "It's a tall rocket; it's been over three decades since anyone has built a rocket this tall. That was the Saturn V.

"We have over 700 sensors on this rocket; and the whole point of Ares 1-X is to understand how does a rocket this shape, this weight, this tall actually fly."

Exploded view of the Ares I. Pic: NASA

The third element of Constellation is the Ares V heavy lifter, NASA's "primary vessel for safe, reliable delivery of large-scale hardware to space - from the lunar landing craft and materials for establishing a Moon base, to food, fresh water and other staples needed to extend a human presence beyond Earth orbit".

The Ares V will employ a couple of solid rocket boosters, similar those those used for the Ares I, bolted to a core stage powered by six RS-68B engines - "upgraded versions of those currently used in the Delta IV". Atop that is the "Earth Departure Stage" powered by a single J-2X Engine.

NASA says this beast will lift "nearly 414,000 pounds (188 metric tons) to low-Earth orbit". Planned payloads include the Altair Lunar Lander.

That's the idea, but the Obama-appointed Review of US Human Flight Plans Committee last month cast serious doubts on the future of NASA's entire human spaceflight programme, concluding that unless more cash was forthcoming, the whole thing was on an "unsustainable trajectory".

NASA hopes to retire the shuttle in 2011, de-orbit the ISS in 2016, and then press on with a return to the Moon. However, the committee concluded that under the current budget, the Ares I and Orion would not be available until after the ISS is de-orbited, the Ares V would not be available until the late 2010s and, "there are insufficient funds to develop the lunar lander and surface systems until well into the 2030s, if ever".

The upshot of all this is a possible scrapping of the Constellation project in favour of other technologies capable of, in the short term, supplying the ISS, and thereafter driving NASA's return to the lunar surface.

Even a return to the Moon is not a foregone conclusion. Many, including Buzz Aldrin, suggest the US should ignore the Moon (been there, done that) and set its sights directly on Mars. ®

Intelligent flash storage arrays

More from The Register

next story
Antarctic ice THICKER than first feared – penguin-bot boffins
Robo-sub scans freezing waters, rocks warming models
I'll be back (and forward): Hollywood's time travel tribulations
Quick, call the Time Cops to sort out this paradox!
Your PHONE is slowly KILLING YOU
Doctors find new Digitillnesses - 'text neck' and 'telepressure'
Reuse the Force, Luke: SpaceX's Elon Musk reveals X-WING designs
And a floating carrier for recyclable rockets
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
Rosetta science team thinks Philae might come to life in the spring
And disclose the biggest surprise of Comet 67P
Bond villains lament as Wicked Lasers withdraw death ray
Want to arm that shark? Better get in there quick
prev story

Whitepapers

10 ways wire data helps conquer IT complexity
IT teams can automatically detect problems across the IT environment, spot data theft, select unique pieces of transaction payloads to send to a data source, and more.
A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
How to determine if cloud backup is right for your servers
Two key factors, technical feasibility and TCO economics, that backup and IT operations managers should consider when assessing cloud backup.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.
Choosing a cloud hosting partner with confidence
Download Choosing a Cloud Hosting Provider with Confidence to learn more about cloud computing - the new opportunities and new security challenges.