What, only 4GB of RAM each? Seems to be a bottle neck for today's VM world.

http://www.theregister.co.uk/2008/02/21/sun_blade_x8450 (@ 246GB RAM)

idataplex competitor 

Posted Friday 30th May 2008 20:38 GMT

This is more like idataplex competitor aimed at ultra high compute density market. Each blade can have only 8GB max RAM to feed 8 cores, and little IO, but you get so many of these discrete 2-socket physical servers in little space. Most HPC/web2.0 customers probably do not need a lot of memory so this may work out well for them. HP is charging quite a premium for this kind of density with this solution. While idataplex has liquid cooling integrated, it would be interesting to know whether there is any integrated liquid cooling at work here.

wouldnt true lower cost be based on how many you can amortize per rack? 

Posted Saturday 31st May 2008 04:46 GMT

wouldnt these 128 200W servers in a rack with hp water cabinet be lower cost to own than 42 230W idataplex with their water rack - neither adds heat to data center?

Maximum memory is per node 

Posted Monday 2nd June 2008 09:55 GMT

The memory is 16GB per node not per blade so it would be 16GB for 8 cores

Fuzz is right 

Posted Tuesday 3rd June 2008 16:31 GMT

Fuzz is right, It's 16GB per server and they're not being aimed at heavy VM usage, more for compute-heavy or forced-scale-out environments.

Also in reference to the IBM iDataplex, they're not in the same league - two racks-worth of these this HP blade model equals 2048 xeon cores and 4TB of memory and are already shipping. It's hard to find details on the IBM system but it looks like they only get either 800 or 1600 cores into the same space, plus of course you end up building your environment two-racks at a time - not always 'do-able'. Oh and they're coming in July.

Don’t Miss

HP LogoWill HP 3PAR high-end storage arrays?

Comment Crossroads for ex-EMC man Dave Donatelli

3comHPcom spells 'IT disaster,' says UK firm

Save the 3Com customers foundation

Data centre boxesEurope clamours for data centre capacity

Price rises on the way

AMD lays out 2011 PC roadmap

Bobcat riding a Bulldozer