Feeds

Astronauts in seven-hour ISS construction session

Canadian robot grappled by spacegoing veterinarian

Build a business case: developing custom apps

Space Shuttle and International Space Station (ISS) astronauts have completed a seven-hour spacewalk and robot-arm session, in which a number of construction and assembly tasks were completed. Part of Japan's "Kibo" ISS module was plugged in, a malfunctioning 12-foot tall 1.5-tonne Canadian robot was hopefully whipped into shape, and a Passive Common Berthing flange was pulled off.

The Canadian 'Dextre' space station robot

Two arms, three tools, 12 feet high but oh so delicate: robots are better than people.

Two astronauts worked in spacesuits, while another pair operated the Shuttle Endeavour's cargo-bay robot arm. The manipulator duo was led by shuttle commander and US Navy pilot Dom Gorie, assisted by Japanese astronaut Takao Doi. The extra-vehicular pair were shuttle specialist Rick Linnehan, who (handily) is a fully-qualified vet, and ISS engineer Garrett Reisman.

The two spacewalkers, having prepared the "Kibo" lab's pressurised logistic module before it was "grappled" by Gorie's robot arm and snapped into place, then carried out tasks involving external camera systems and berthing flange collars.

Following these efforts, the intrepid astro-construction men fitted "Orbital Replacement Unit tool" mechanisms to "Dextre", the mighty Canadian robot shipped up to the ISS aboard Endeavour.

Dextre is officially called the Canadian Special Purpose Dexterous Manipulator. It is supposed to be moved around the outside of the ISS on the end of a massive articulated arm, Canadarm2, which has already been fitted to the space station. The mighty tonne-and-a-half robot has two 11-foot arms of its own, video cams, lights, and "three robotic tools" with which it can "perform delicate human-scale tasks", it says here (pdf, p54).

This will allow maintenance and so on to be done without time-consuming, potentially dangerous spacewalking by human astronauts.

At present, unfortunately, Dextre doesn't work.

"Initial attempts to route power to Dextre were not successful Thursday," according to NASA, and the partly-assembled Dextre has been "temporarily parked on the station's truss".

The plan is to grapple the recalcitrant robot with the Canadarm2 later today. "With Dextre grappled to the arm, the cabling path that is believed to be causing communications interference will not be in the loop", apparently, and "it is expected that normal communications will then be established."

Spacegoing veterinarian Linnehan and his fellow shuttle specialist Michael Foreman will perform a further spacewalk tomorrow to fully sort Dextre out. ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
Boffins attempt to prove the UNIVERSE IS JUST A HOLOGRAM
Is this the real life? Is this just fantasy?
Our LOHAN spaceplane ballocket Kickstarter climbs through £8000
Through 25 per cent but more is needed: Get your UNIQUE rewards!
China building SUPERSONIC SUBMARINE that travels in a BUBBLE
Shanghai to San Fran in two hours would be a trick, though
LOHAN tunes into ultra long range radio
And verily, Vultures shall speak status unto distant receivers
SpaceX prototype rocket EXPLODES over Texas. 'Tricky' biz, says Elon Musk
No injuries or near injuries. Flight stayed in designated area
Galileo, Galileo! Galileo, Galileo! Galileo fit to go. Magnifico
I'm just a poor boy, nobody loves me. But at least I can find my way with ESA GPS by 2017
EOS, Lockheed to track space junk from Oz
WA facility gets laser-eyes out of the fog
prev story

Whitepapers

Top 10 endpoint backup mistakes
Avoid the ten endpoint backup mistakes to ensure that your critical corporate data is protected and end user productivity is improved.
Implementing global e-invoicing with guaranteed legal certainty
Explaining the role local tax compliance plays in successful supply chain management and e-business and how leading global brands are addressing this.
Backing up distributed data
Eliminating the redundant use of bandwidth and storage capacity and application consolidation in the modern data center.
The essential guide to IT transformation
ServiceNow discusses three IT transformations that can help CIOs automate IT services to transform IT and the enterprise
Next gen security for virtualised datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.