Feeds

Atlantis looks good to go

Shuttle launch Thursday, weather permitting

Choosing a cloud hosting partner with confidence

Space shuttle Atlantis looks good to go for blast-off Thursday from NASA's Kennedy Space Center in Florida, weather permitting.

The mission to carry Europe's Columbus laboratory to the ISS has twice been delayed by faulty sensors monitoring liquid hydrogen levels in the vessel's fuel tank. The offending devices are designed to prevent the shuttle's engines running dry, provoking an explosion.

Atlantis's commander Stephen Frick said: "We can't afford to let the engines run dry because they tend to come apart."

He continued: "The sensor problem has been nagging us for quite a long time. We were able to pull the hardware out, find out what the problem really is and get a chance to fix it properly so we don't have to worry about it."

Following tests of the sensor connectors, NASA reported (pdf): "Open circuits in the part that connects wires from the interior to the exterior of the liquid hydrogen tank, commonly known as the feed through plate, were identified as the culprit that caused false readings during two launch attempts and a tanking test in December 2007."

NASA's solution was to knock together a modified connector "with the pins and sockets soldered together", and more tests subsequently "verified the adequacy of the new configuration".

NASA also identified a potential problem with a bent cooling system hose in Atlantis's payload bay earlier this week, but technicians "used a special tool to guide the hose back into its storage box while the payload bay doors were closed", as the agency puts it.

Forecasts for 7 February indicate a 40 per cent chance of favourable weather. Lift-off is scheduled for 14.45 EST (19.45 GMT).

During the 11-day mission, the team will install the aforementioned Columbus lab - a task involving three spacewalks - as well as delivering some new experiments and doing a few "maintenance chores".

European Space Agency astronaut Leopold Eyharts will remain on the ISS to oversee the experiments, relieving Daniel Tani who travelled to the station on Discovery's 23 October mission. There are full details here (pdf). ®

Intelligent flash storage arrays

More from The Register

next story
Antarctic ice THICKER than first feared – penguin-bot boffins
Robo-sub scans freezing waters, rocks warming models
I'll be back (and forward): Hollywood's time travel tribulations
Quick, call the Time Cops to sort out this paradox!
Your PHONE is slowly KILLING YOU
Doctors find new Digitillnesses - 'text neck' and 'telepressure'
Reuse the Force, Luke: SpaceX's Elon Musk reveals X-WING designs
And a floating carrier for recyclable rockets
Britain's HUMAN DNA-strewing Moon mission rakes in £200k
3 days, and Kickstarter moves lander 37% nearer takeoff
Rosetta science team thinks Philae might come to life in the spring
And disclose the biggest surprise of Comet 67P
Bond villains lament as Wicked Lasers withdraw death ray
Want to arm that shark? Better get in there quick
prev story

Whitepapers

Designing and building an open ITOA architecture
Learn about a new IT data taxonomy defined by the four data sources of IT visibility: wire, machine, agent, and synthetic data sets.
A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
5 critical considerations for enterprise cloud backup
Key considerations when evaluating cloud backup solutions to ensure adequate protection security and availability of enterprise data.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.
Protecting users from Firesheep and other Sidejacking attacks with SSL
Discussing the vulnerabilities inherent in Wi-Fi networks, and how using TLS/SSL for your entire site will assure security.