Feeds

UK goes green with gassy offshore wind farm

Environmental indigestion?

New hybrid storage solutions

As the UK becomes only the seventh nation to have more than two GigaWatts of electricity generated by wind farms, the government has given the green (no pun intended) light to the world's first offshore combined wind and gas energy scheme.

Despite sounding like something that needs a cup of green tea to settle, we are assured that the project, sited off the Cumbrian coast, will generate up to 200MW of electricity, almost half of which will be generated by wind turbines.

The development will see 30 turbines being installed offshore, alongside a conventional gas power station that will pick up any slack when there is not enough wind to turn the turbines. It will use gas pumped in from two fields in nearby Morecambe Bay.

Department of Trade and Industry (DTI) approval is still required for the pipeline from Morecambe, as planning had to be applied for separately. Pipelines and power plants fall under different legislation. The DTI notes that today's approval "does not prejudge the outcome" of the application.

Once operational, the wind farm will provide energy for around 70,000 homes, the DTI says.

The news comes just months after the DTI gave its blessing to a 341-turbine offshore wind farm, in coastal waters in Kent.

Energy minister Lord Truscott noted: "We are starting to see a real flow of approvals for energy projects in UK waters. The London Array and Thanet schemes in the Thames Estuary went through in December and the good progress continues in 2007. [This] scheme is unusual in that it will combine wind and gas power to produce continuous electricity for the region."

The project is expected to be completed in 2010, subject to planning, of course. ®

Secure remote control for conventional and virtual desktops

More from The Register

next story
Boffins say they've got Lithium batteries the wrong way around
Surprises at the nano-scale mean our ideas about how they charge could be all wrong
Thought that last dinosaur was BIG? This one's bloody ENORMOUS
Weighed several adult elephants, contend boffins
Europe prepares to INVADE comet: Rosetta landing site chosen
No word yet on whether backup site is labelled 'K'
City hidden beneath England's Stonehenge had HUMAN ABATTOIR. And a pub
Boozed-up ancients drank beer before tearing corpses apart
'Duck face' selfie in SPAAAACE: Rosetta's snap with bird comet
Probe prepares to make first landing on fast-moving rock
Archaeologists and robots on hunt for more Antikythera pieces
How much of the world's oldest computer can they find?
prev story

Whitepapers

Providing a secure and efficient Helpdesk
A single remote control platform for user support is be key to providing an efficient helpdesk. Retain full control over the way in which screen and keystroke data is transmitted.
Top 5 reasons to deploy VMware with Tegile
Data demand and the rise of virtualization is challenging IT teams to deliver storage performance, scalability and capacity that can keep up, while maximizing efficiency.
Reg Reader Research: SaaS based Email and Office Productivity Tools
Read this Reg reader report which provides advice and guidance for SMBs towards the use of SaaS based email and Office productivity tools.
Security for virtualized datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.
Secure remote control for conventional and virtual desktops
Balancing user privacy and privileged access, in accordance with compliance frameworks and legislation. Evaluating any potential remote control choice.