Feeds

Rosetta still earthbound

Urgent repairs mean no comet chasing until Monday

  • alert
  • submit to reddit

Intelligent flash storage arrays

The launch of the comet-chasing Rosetta mission has been delayed again, this time to allow for repairs to the Ariane 5 rocket's thermal sheilding. Lift-off was cancelled after the mission team noticed an area of foam protecting the main fuel tank was missing during a final inspection.

This thermal protection prevents potentially dangerous lumps of ice forming on the tank. The launcher will be moved to the Spaceport's final assembly building where engineers will replace the missing foam block.

The glue holding the new piece in place takes around 36 hours to dry and set, so the next launch attempt will be made on Monday next week.

ESA director of science, Dr. David Southwood, said that the ESA felt an attachment to cometary exploration: "Rosetta is psychologically very important for us in Europe, because we did get closest to Halley (with Giotto). So comets are ours," he told the BBC last week.

The Ariane 5 rocket has a colourful history, and the Rosetta mission has in the past been delayed because of concerns over its reliability. Scientists must be hoping that this latest hiccupp is just that, and that everything goes according to plan on Monday. ®

Related stories

Comet-chasing Rosetta still on launchpad
Comet chasers seek secret of life

Providing a secure and efficient Helpdesk

More from The Register

next story
GRAV WAVE DRAMA: 'Big Bang echo' may have been grit on the scanner – boffins
Exit Planet Dust on faster-than-light expansion of universe
Mine Bitcoins with PENCIL and PAPER
Forget Sudoku, crunch SHA-256 algos
SpaceX Dragon cargo truck flies 3D printer to ISS: Clawdown in 3, 2...
Craft berths at space station with supplies, experiments, toys
That glass of water you just drank? It was OLDER than the SUN
One MEELLION years older. Some of it anyway
NASA rover Curiosity drills HOLE in MARS 'GOLF COURSE'
Joins 'traffic light' and perfect stony sphere on the Red Planet
'This BITE MARK is a SMOKING GUN': Boffins probe ancient assault
Tooth embedded in thigh bone may tell who pulled the trigger
Big dinosaur wowed females with its ENORMOUS HOOTER
That's right, Doris, I've got biggest snout in the prehistoric world
Japanese volcano eruption reportedly leaves 31 people presumed dead
Hopes fade of finding survivors on Mount Ontake
Canberra drone team dances a samba in Outback Challenge
CSIRO's 'missing bushwalker' found and watered
prev story

Whitepapers

A strategic approach to identity relationship management
ForgeRock commissioned Forrester to evaluate companies’ IAM practices and requirements when it comes to customer-facing scenarios versus employee-facing ones.
Storage capacity and performance optimization at Mizuno USA
Mizuno USA turn to Tegile storage technology to solve both their SAN and backup issues.
High Performance for All
While HPC is not new, it has traditionally been seen as a specialist area – is it now geared up to meet more mainstream requirements?
Beginner's guide to SSL certificates
De-mystify the technology involved and give you the information you need to make the best decision when considering your online security options.
Security for virtualized datacentres
Legacy security solutions are inefficient due to the architectural differences between physical and virtual environments.